CONSTRUCTION PROJECT DATABASE
Version: 4.0.2.1
Build Date: 2/26/2012 10:58 PM
 
 

Project Listing

  • Click on a column header to sort the table by that column. Click again to reverse the sort, and again to remove it. You can sort by multiple columns simultaneously.
  • Filter the table by entering a search term in the filter box at the top of the column that contains your search field. Select the filter criteria (starts with, contains, etc.) by clicking on the funnel next to the filter box. You can filter multiple columns simultaneously, and combine filters with sorts.
  • To group related records, drag the header for the column that you wish to segregate into groups into the blue bar at the top of the table (selected columns only). To ungroup, drag the column name out of the blue bar.
  • Clicking on the icons at the left of each record will provide access to bid information, detailed schedules, and photos when available.
  • For a definition of the different project statuses and phases please click here
Drag a column header and drop it here to group by that column
  StatusProject NumberPhaseSiteDescriptionCoordinatorContractorDesign ProfessionalConstruction StartSubstantial CompletionConstruction BudgetTypeAdmin Area
    
Data pager
Data pager
 Page 1 of 26, items 1 to 50 of 1300.
180181-PlanningBevisPainting & WaterproofingBenMooreTBD (Continuing Services CM)TBD (Continuing Services Engineer) not recorded not recorded not recorded Maintenance6
180091-PlanningBrandonRoofingBenMooreTBD (Continuing Services CM)TBD (Continuing Services Engineer) not recorded not recorded not recorded Maintenance7
180041-PlanningCaminitiRoofingBenMooreTBD (Continuing Services CM)C.B. Goldsmith & Associates, Inc. 5/26/2018 11/21/2018 $619,000.00 Maintenance4
170381-PlanningColsonChiller ReplacementManuel GarciaJohnson Controls, Inc.NA (in-house) 3/12/2018 3/16/2018 $184,027.33 Renovation7
170221-PlanningCrestwoodHVAC Renovation Manuel GarciaWalbridge Aldinger CompanySGM Engineering, Inc. 5/1/2018 7/31/2018 $2,500,000.00 Renovation2
180191-PlanningDavisPainting & WaterproofingBenMooreTBD (Continuing Services CM)TBD (Continuing Services Engineer) not recorded not recorded not recorded Maintenance2
180031-PlanningFolsomRoofingBenMooreTBD (Continuing Services CM)C.B. Goldsmith & Associates, Inc. 5/26/2018 11/21/2018 $865,181.00 Maintenance7
180111-PlanningHunters GreenParent Pick Up ImprovementsChuck PlanteNA (by others)Hamilton Engineering & Surveying, Inc. not recorded not recorded $26,000.00 Maintenance3
180061-PlanningLake MagdaleneRoofingBenMooreTBD (Continuing Services CM)TBD (Continuing Services Engineer) not recorded not recorded not recorded Maintenance4
180211-PlanningLeeNew/RebuildChuck PlanteTBD (Continuing Services CM)TBD (Continuing Services Engineer) not recorded not recorded not recorded Renovation4
180221-PlanningLeeWind BracingChuck PlanteNA (by others)NA (by others) not recorded not recorded not recorded Maintenance4
170411-PlanningLewisChiller ReplacementManuel GarciaHill York Air Conditioning ServiceNA (in-house) 3/12/2018 3/16/2018 $221,956.00 Renovation3
180131-PlanningLithia SpringsRoofingBenMooreTBD (Continuing Services CM)TBD (Continuing Services Architect) not recorded not recorded not recorded Renovation6
170391-PlanningMartinezChiller ReplacementManuel GarciaAir Mechanical & Service Corp.NA (in-house) 3/12/2018 3/16/2018 $290,997.00 Renovation2
170401-PlanningMckitrickChiller ReplacementManuel GarciaAir Mechanical & Service Corp.NA (in-house) 3/12/2018 3/16/2018 $242,635.00 Renovation2
180071-PlanningMclaneRoofingBenMooreTBD (Continuing Services CM)TBD (Continuing Services Engineer) not recorded not recorded not recorded Maintenance7
180171-PlanningMiddletonStage Lighting ReplacementJeff McNickleNA (by others)NA (by others) not recorded not recorded not recorded Renovation4
170281-PlanningMorgan WoodsHVAC RenovationManuel GarciaGilbane Building CompanyOssi Consulting Engineers, Inc. 5/1/2018 7/31/2018 $1,700,000.00 Renovation2
180201-PlanningMultiple SitesInsulation Removal 6 Sites (Franklin, Limona, Mango, McLane, Schmidt, Wimauma)Manuel GarciaRW TYMEWELL, INC.NA (in-house) 5/28/2018 8/8/2018 $298,788.00 Maintenance0
179991-PlanningMultiple SitesMisc. Minor Repair ProjectsManuel GarciaNA (multisite project)NA (in-house) not recorded not recorded not recorded Maintenance0
180151-PlanningMultiple SitesSunshade Replacement 2 sites (Nelson, Summerfield)Chuck PlanteRex Farlow Construction, Inc.TBD (Continuing Services Engineer) 3/1/2018 3/25/2018 $211,650.54 Renovation0
180081-PlanningNifong BuildingRoofingBenMooreTBD (Continuing Services CM)TBD (Continuing Services Engineer) not recorded not recorded not recorded Maintenance6
170071-PlanningNon-SBHC or Future SiteElementary DChuck PlanteAllstate Construction, Inc.Holmes Hepner & Associates Architects, Inc. not recorded not recorded $15,874,109.00 New Construction0
180121-PlanningPinecrestParking Lot DrainageMichaelBusciglioNA (by others)Kisinger Campo & Associates Corp. not recorded not recorded not recorded Maintenance6
170141-PlanningPotterre roofingBenMooreMcEnany Roofing, IncorporatedRoof Engineering Associates, Inc. 7/10/2017 8/10/2017 $105,257.00 Renovation4
180051-PlanningSchwarzkopfRoofingBenMooreTBD (Continuing Services CM)C.B. Goldsmith & Associates, Inc. 5/26/2018 11/21/2018 $688,833.00 Maintenance2
180011-PlanningShawRoofingBenMooreTBD (Continuing Services CM)Roof Engineering Associates, Inc. not recorded not recorded $1,128,546.00 Maintenance3
10961-PlanningSpotoWall joint remediationJill EdwardsHCBeck, Ltd. dba The Beck GroupBiller Reinhart Structural Group, Inc. not recorded not recorded $250,000.00 Renovation5
115071-Planningtest sitepaintingTBDNA (study only)NA (by others) not recorded not recorded not recorded Remodel5
150001-Planningtest site2Another test    not recorded not recorded not recorded Maintenance6
180021-PlanningThonotosassaRoofingBenMooreTBD (Continuing Services CM)Roof Engineering Associates, Inc. 7/25/2018 1/19/2019 $981,288.00 Maintenance7
170251-PlanningTinkerMaster Plan AnalysisTBD   not recorded not recorded not recorded Planning1
170291-PlanningWashingtonHVAC RenovationManuel GarciaWharton-Smith, Inc.RHC and Associates,Inc. 5/1/2018 7/31/2018 $2,500,000.00 Renovation1
170271-PlanningWilliamsHVAC ReplacementManuel GarciaAllstate Construction, Inc.SGM Engineering, Inc. 1/1/2018 7/31/2018 not recorded Renovation7
180161-PlanningWilson MiddleChiller ReplacementJamesDieringerTBD (Continuing Services CM)TBD (Continuing Services Engineer) not recorded not recorded not recorded Renovation1
170302-DesignEdisonHVAC RenovationChuck PlanteNA (by others)VoltAir Consulting Engineers, Inc. 5/1/2018 7/31/2018 $6,700,000.00 Renovation4
180102-DesignFreedomCooling TowerChuck PlanteTBD (Continuing Services CM)TBD (Continuing Services Engineer) not recorded not recorded not recorded Maintenance3
170422-DesignGorrieHVAC Replacement Phase 1Chuck PlanteCharles Perry Partners, Inc.ENGINEERING PROFESSIONALS INC 5/1/2018 7/31/2018 not recorded Renovation1
170332-DesignMclaneRoof ReplacementBenMooreRW TYMEWELL, INC.Roof Engineering Associates, Inc. 1/15/2018 3/31/2018 $103,000.00 Renovation7
170192-DesignNon-SBHC or Future SiteHigh School TTTChuck PlanteCore ConstructionHarvard Jolly, Inc. 11/1/2018 7/24/2020 $49,000,000.00 New Construction0
170132-DesignPotterHVAC Packaged Roof TopJamesDieringerKenyon & Partners, Inc.RHC and Associates, Inc. 12/1/2017 7/31/2018 $640,000.00 Maintenance4
17032 2-DesignRiverview ElementaryRoof ReplacementBenMooreRW TYMEWELL, INC.NA (design-build) 1/15/2018 3/31/2018 $200,000.00 Renovation8
170092-DesignRobinson HighClassroom AdditionChuck PlanteAjax Building CorporationJohn J. McKenna, Architect PA 5/7/2018 7/15/2019 $4,500,000.00 New Construction1
170262-DesignSummerfieldRoof ReplacementBenMooreRW TYMEWELL, INC.C.B. Goldsmith & Associates, Inc. 11/27/2017 2/27/2018 $280,000.00 Renovation8
170342-DesignWarehouseRoof ReplacementBenMooreRW TYMEWELL, INC.Roof Engineering Associates, Inc. 1/15/2018 3/31/2018 $280,000.00 Renovation3
170233-BiddingCypress CreekHVAC RenovationChuck PlanteCreative Contractors, Inc.Lyle Engineering Group, Inc. 5/1/2018 7/31/2018 $3,400,000.00 Renovation8
180143-BiddingMultiple SitesExpoxy Pipe LiningChuck PlanteTBD (Continuing Services CM)TBD (Continuing Services Engineer) 5/29/2018 7/13/2018 not recorded Maintenance0
170374-ConstructionMultiple SitesGreenhouse Repairs at 3 Sites (East Bay, Steinbrenner, Strawbery Crest)Chuck PlanteRex Farlow Construction, Inc.NA (design-build) 11/13/2017 3/15/2018 $43,978.37 Remediation0
170154-ConstructionMultiple SitesHurricane Hardening at 2 Sites (Erwin, McLane)Chuck PlanteR L BurnsRenker, Eich, Parks Architects, Inc. 3/7/2018 7/31/2018 $800,000.00 Renovation0
170024-ConstructionMultiple SitesRoof replacement at 2 Sites (Hillsborough, Lee)BenMooreRW TYMEWELL, INC.Roof Engineering Associates, Inc. 4/28/2017 8/4/2017 $1,050,000.00 New Construction0